Followers

Monday, 2 October 2017

Posted by Master IK
No comments | 11:36
-In a telephone system, the bandwidth of a voice channel ranges is from 300Hz to 3400Hz. -The bandwidth allocated for a single voice frequency transmission channel is usually 4kHz,including two guard band (0-300Hz) and (3400Hz-4000Hz) to prevent adjacent frequency interference and,allowing a sampling rate of 8kHz to be used as the basic of the pulse code modulation system used for the digital PSTN...
Posted by Unknown
No comments | 10:55
connectivity of telephone network architecture           MAIN DISTRIBUTION FRAME (MDF) - main cross connection point between the Outside Plant (OSP) cable pairs and the exchange. - it provides a great flexibility for line testing functions as well as electrical protection. Used for line     terminations.    MAN HOLE - a jointing chamber / breakout point of cables which...
Posted by Unknown
No comments | 10:49
TELEPHONE SET COMPONENT •DTMF circuit and keypad • tone ringer circuit • microprocessor unit (MPU) • speech network • line voltage regulator circuit • loop or line interface • on/off hook circuit • speaker and microphone THE BLOCK DIAGRAM OF TELEPHONE ...
Posted by Unknown
No comments | 10:18
Tip and Ring explanation in Chapter 1 Figure 1: tip and ring in telephony Tip and Ring are telephony slang for the two wires which make up the electrical circuit used for telephone wiring. Tip is the nickname for the electrically positive wire and Ring is the nickname for the electrically negative wire. Differences Between TIP And RING ...
Posted by Unknown
No comments | 09:42
Block Diagram Of Telephone Set Telephone Set Component - DTMF circuit and keypad   DTMF (Dual Tone Multi Frequency) as the name suggest uses a combination of two sine wave      tones to represent a key. keypad - Tone ringer circuit    The tone ringer drives a piezoelectric sound element that produces an electronic ring. Ringer Circuit - Microprocessor   The MPU with RAM, control the function...
Posted by Unknown
No comments | 09:29
Main Distribution Frame ( MDF ) • The Main Distribution Frame is situated at the telephone exchange. • It used to connect the customer ( phone user ) with the main switching system after passing through the cabinet. Cabinet The cabinet's functions • To save the usage of cable and replacing cable would be easier. • To avoid the joint to be opened and this would save cost and time . • To act as a place to perform maintenance...
Posted by Unknown
No comments | 08:53
The Basic Function Of Electronic Telephone 1. It requests the use of the telepohone system when the handset is lifted. 2. It indicates thet the system is ready for use by receiving a tone, called dialing tone. 3. It sends the number of the telephone to be called to the system. This number is initiated by the        caller when the number is pressed or the dial is rotated. 4. It indicates the state of the call in progress by receiving tones indicating the status (ringing, busy,    etc). 5. It indicates...
Posted by Unknown
No comments | 07:50
Public Switched Telephone Network - circuit-switched technology which consists of transmission path and nodes, - The PSTN subscriber does not require any specific knowledge – just dial and answer. -The subscriber of PSTN are interconnected only temporary through switches Main Elements Of PSTN: 1.Subscriber Loop 2.Customer Premises Equipment(CPE) 3.Exchange 4.Transport System 5.Signalling System ...

Thursday, 28 September 2017

Posted by Unknown
No comments | 20:44
Telephone communication is one of the most important forms of communication within the compan...

Tuesday, 26 September 2017

Posted by Master IK
No comments | 07:29
Aktiviti Fun Quiz telah diadakan pada 19/9/2017(selasa) di bilik TEC 2,CDEC bersama pensyarah Cik Rohana Binti Hasan dan Pelajar dari DEP 3B. 3 bab kuiz telah diuji iaitu: 1.Introduction To Telephony Network 2.Transmission System And Digital Hierarchy 3.Signalling System Berikut merupakan senarai nama ringkas pemenang: Kuiz 1: 1.Ezzat Syahmy 2.Muhammad Ikram 3.Ikhwan Ilhami Kuiz 2: 1.Hanis Atiqah 2.Nur Nabihah 3.Nur Aida Kuiz 3: 1.Suhaili 2.Ahmad...

Monday, 25 September 2017

Posted by Unknown
No comments | 21:36
Pada 26/9/2017 Selasa.kami Dari kelas DEP3B telah mengikuti sesi pembinaan mini learning site atau lebih dikenali sebagai blog. kami telah membina blog mengikut kumpulan dan setiap kumpulan diberi tugasan yang berbeza. Gambar yang diambil semasa aktiviti ini dijalankan: #SoaringUpwards #P...
Posted by Unknown
No comments | 21:32
...
Posted by Master IK
1 comment | 21:23
Group 1: 1.MUHAMMAD IKRAM BIN DAUD  -09DEP16F1005(ADMIN&LEADER) 2.MUHAMMAD NOR AMINSHAH BIN ABU BAKAR -09DEP16F1007 3.AFIQ SYAHMI BIN MOHD TARMIZI -  09DEP16F1003 4.NUR NABIHAH BINTI MOHAMMED DIAH -09DEP16F1051 5.NUR ZULAIKHA BINTI IBRAHIM-09DEP16F1002 6.NUR DALILA BINTI MOHD JOHAR - 09DEP16F1019 OUR GROUP MEMBERS.... #SoaringUpwards #PIS ...
M4573R 1K. Powered by Blogger.